Monday, February 3, 2025
Subscribe to:
Post Comments (Atom)
The MHS prefab building system is composed of three elements: MHS extruded aluminum posts- beams, Structural insulated panels (SIPs) which fit within the unique channel configuration of the aluminum framing members and the MHS aluminum connectors including a patented quick-connect bolt and clamp locking system.
No comments:
Post a Comment